This project is taking quite a bit longer than originally anticipated.
Here’s what it looked like before we moved in:

So what we will be doing to repair it is the following:
- sand it down to the best of our ability using a hand sander
- applying peel bond (or something similar) with a roller
- Drywall/sheetrock repair “mud”
- then paint
This all means it will take a lot longer than one weekend to get this done.
Count of rooms left to paint: 4 (not including the basement)
Count of rooms we have paint for: 4 (but we aren’t completely settled on one, so really 3 and an extra gallon)
Wish us luck!
One thought on “Dining Room updates”